Variance

A measurable difference between actual results and the approved baseline or expected value.

Key Points

  • Always calculated against a defined baseline (scope, schedule, cost, quality, or other metrics).
  • Can be favorable or unfavorable; the sign convention (positive/negative) should be defined in the management plan.
  • May be shown in units (days, dollars, defects) or as a percentage, and tracked over time to spot trends.
  • Used in variance analysis and EVM to trigger root-cause investigation, corrective actions, or change requests based on thresholds.

Example

The cost baseline for a phase is USD 200,000, but the team spent USD 215,000. The cost variance (Actual - Baseline) is +USD 15,000, indicating an overrun that requires analysis and potential corrective action.

PMP Example Question

During monitoring and controlling, a project manager notes that actual costs exceed the cost baseline by USD 75,000. What is this difference called?

  1. Variance
  2. Change request
  3. Risk
  4. Assumption

Correct Answer: A — Variance

Explanation: Variance is the measurable gap between actual performance and the approved baseline or expected value.

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Launch your Agile career!

HK School of Management and Technology helps you learn Agile and Scrum with practical playbooks, AI-powered prompts, and real-world workflows for planning and delivery. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More