Specification

A clear, exact description of the needs to be met and the critical characteristics that must be included.

Key Points

  • Defines what must be delivered and how it will be judged acceptable.
  • Should be measurable, verifiable, and unambiguous.
  • Serves as a baseline for scope, quality planning, and procurement.
  • Changes to specifications must follow formal change control.

Example

For a water pump procurement, the document states: flow rate 200 gpm, head 50 m, stainless steel impeller, ISO 9906 testing, maximum vibration 4.5 mm/s, NPSH available 10 ft, and operating temperature 5-60 C. This is the specification used to evaluate vendor offers and verify the delivered pump.

PMP Example Question

While preparing bid documents, the team lists required performance values, materials, applicable standards, tolerances, and test methods for a custom component. What document are they producing?

  1. Project charter
  2. Requirements traceability matrix
  3. Specification
  4. Risk register

Correct Answer: C — Specification

Explanation: A specification precisely states the needs and essential characteristics, including measurable requirements and verification methods used for acceptance.

Advanced Project Management — Measuring Project Performance

Move beyond guesswork and status reporting. This course helps you measure real progress, spot problems early, and make confident decisions using proven project performance techniques. If you manage complex projects and want clearer visibility and control, this course is built for you.

This is not abstract theory. You’ll work step by step through Earned Value Management (EVM), learning how cost, schedule, and scope come together to show true performance. You’ll build a solid foundation in EVM concepts, understand why formulas work, and learn how performance data actually supports leadership decisions.

You’ll master Work Breakdown Structures (WBS), control accounts, and budget baselines, then apply core EVM metrics like EAC, TCPI, and variance analysis. Through a detailed real-world example, you’ll forecast outcomes, analyze trends, and understand contingencies and management reserves with confidence.

Learn how experienced project managers monitor performance, communicate results clearly, and take corrective action before projects slip. With practical exercises and hands-on analysis, you’ll be ready to apply EVM immediately. Enroll now and start managing performance with clarity and control.

Explore the Course


Launch your career!

HK School of Management and Technology provides world-class training in Project Management with AI and Agile Methodologies. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More