impediment

A hindrance that stops the team from meeting its goals; commonly called a blocker.

Key Points

  • Impediments obstruct progress toward sprint or project objectives.
  • They are surfaced during the Daily Scrum and tracked until resolved.
  • The Scrum Master facilitates removal or escalation of impediments.
  • They can be internal (skills gaps, unclear requirements) or external (tool outages, organizational policies).

Example

The test environment is down, preventing QA from validating user stories. The Scrum Master logs the impediment, escalates to the infrastructure team, and negotiates a temporary workaround to unblock testing.

PMP Example Question

During the Daily Scrum, a developer reports they cannot complete a story because a required API license has expired. What is this situation best described as?

  1. Risk
  2. Assumption
  3. Impediment
  4. Change request

Correct Answer: C — impediment (a blocker)

Explanation: The expired license is a present-time obstacle that halts progress, which is an impediment, not a future uncertainty (risk) or a change request.

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Advance your Lean Six Sigma expertise!

HK School of Management and Technology helps you take Lean Six Sigma to the next level without the overwhelm. Master advanced statistical tools, Excel-based analysis, and real-world improvement techniques to solve complex problems with confidence. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More