Functional Requirement

A precise, testable behavior that the product or service must carry out.

Key Points

  • Defines what the solution does: actions, inputs, outputs, and rules.
  • Different from non-functional requirements, which describe quality attributes like performance or security.
  • Should be clear, measurable, traceable, and testable.
  • Often captured as user stories, use cases, or acceptance criteria in agile backlogs.

Example

When a customer submits an order, the system validates the items, calculates tax, and sends a confirmation email within 1 minute.

PMP Example Question

Which of the following best represents a functional requirement for an e-commerce platform?

  1. The system must maintain 99.9% uptime during peak season.
  2. The application shall allow users to reset their password via a verification email.
  3. Stakeholder satisfaction should improve quarter over quarter.
  4. The project team will adopt Scrum with 2-week sprints.

Correct Answer: B - required product behavior

Explanation: Option B describes a specific behavior the product must perform, which is a functional requirement. The others are non-functional (A), a business goal (C), and a process choice (D).

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Take Control of Project Performance!

HK School of Management and Technology helps you go beyond status reports and gut feelings. In this advanced course, you will learn Earned Value Management (EVM) to measure progress, forecast outcomes, and take corrective action. Learn how WBS quality drives performance, how control accounts work, and how to use EAC, TCPI, and variance analysis. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More