Broken Comb

A team member who brings several relevant skills with uneven levels of proficiency across them, enabling flexible contribution across the teams work. Also called Paint Drip; related to T-shaped and I-shaped skill profiles.

Key Points

  • Multi-skilled individual with different depths of expertise across several areas.
  • Supports swarming, reduces handoffs and bottlenecks, and improves flow.
  • Visual metaphor: comb teeth of varying lengths represent skill depth per domain.
  • Compare with T-shaped (one deep, many shallow) and I-shaped (single deep) profiles.

Example

In a Scrum team, a developer can build APIs, write test automation, assist with UX reviews, and handle CI/CD tasks. They are strongest in backend work but can step into testing or DevOps when the team needs help, illustrating a broken-comb skill set.

PMP Example Question

In an agile team, which skill profile best describes a member who can contribute at different proficiency levels across coding, testing, UX, and DevOps, enabling effective swarming during sprints?

  1. T-shaped
  2. I-shaped
  3. Broken Comb (Paint Drip)
  4. Generalist with no depth

Correct Answer: C — Broken Comb (Paint Drip)

Explanation: A broken-comb professional has multiple skills with varying depths, allowing them to contribute across several domains. T-shaped has one deep area with broad shallow skills, and I-shaped focuses on a single deep specialty.

ICS/OT Incident Response Drills and Exercises

An incident response plan is only a theory until the people who must use it have run it under pressure. This course helps OT engineers, operations leaders, IT responders, and security teams turn a plan on paper into a tested capability.

Define safe states and manual fallback before an incident forces the decision. Build escalation paths, tabletop exercises, and scenarios that expose the gaps a document review cannot find.

Then turn the results into evidence: an after-action report, owned improvements, recovery checks, and a drill cadence that keeps the program alive after the exercise ends.

24 lessons, 2.4 hours. US$47 one-time through HKSM Courses. 30-day money-back guarantee when 50% or less consumed.

Explore the Course


ICS/OT Incident Response Drills and Exercises course preview

Run the drill before the incident runs you

Design, run and prove OT drills and tabletop exercises before an incident tests your team. OT Incident Drills and Exercises includes 24 lessons and practical exercise materials, delivered through HKSM Courses for US$47 one-time. 30-day money-back guarantee when 50% or less of the course has been consumed.

Explore the Course