Blocker

A blocker is a specific impediment that halts or severely delays work, preventing a team or individual from moving forward until it is removed. It should be surfaced quickly, made visible, and escalated for resolution. See Impediment.

Key Points

  • Stops progress immediately until resolved; not just a minor slowdown.
  • Raised promptly (e.g., in the Daily Scrum) and tracked on an impediment log or board.
  • Common sources include access issues, broken environments, missing decisions, or external dependencies.
  • The Scrum Master or Agile leader facilitates removal, while the team may swarm to restore flow.

Example

A developer cannot deploy because production credentials have not been granted. Work on the release is paused until access is approved. The team records this as a blocker and the Scrum Master escalates it to the security team.

PMP Example Question

During the Daily Scrum, the team reports that the test environment is down, preventing all testing from proceeding. How should this be classified?

  1. A risk to be analyzed later
  2. A blocker requiring immediate removal
  3. An assumption to document
  4. A retrospective action item

Correct Answer: B — A blocker (an impediment that stops progress)

Explanation: The test environment outage prevents work from continuing now, which is the definition of a blocker; it needs swift escalation and resolution.

ICS/OT Cybersecurity Fundamentals — Security Built for Industrial Systems

Industrial control systems cannot be secured like ordinary IT. A forced reboot, aggressive scan, or incompatible patch can interrupt production and create real safety consequences. Effective OT security begins with understanding the systems, constraints, and risks unique to industrial environments.

This course gives IT professionals, engineers, operators, and security practitioners a practical foundation in ICS threats, zone and conduit design, risk assessment, passive asset visibility, and vendor evaluation. You will learn how IEC 62443, NIST CSF, and MITRE ATT&CK for ICS apply where availability and safety come first.

Eight reconstructed incidents—including Stuxnet, Triton, Ukraine 2015, Colonial Pipeline, and PIPEDREAM—show how attackers move through OT environments, what they target, and which defenses could have changed the outcome.

Watch the course preview, then build the vocabulary, frameworks, and judgment needed to take credible first steps in ICS/OT cybersecurity.

Explore the Course


ICS/OT Cybersecurity Fundamentals course preview

Launch your career!

HK School of Management and Technology offers training in project management, job-search strategies, and career growth. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More