How to Build Cummulitive Charts

The Competitive Edge for Modern Project Managers

How to Build a Cumulative Flow Diagram (Using the Template)

A Cumulative Flow Diagram (CFD) visualizes how work items move through your workflow over time. It helps you spot bottlenecks, manage Work in Progress (WIP), and understand throughput and lead time trends. This guide shows how to fill the Excel template and produce a clear CFD.

Donwload templates in Downlaods

What’s in the Template

  • Day (or Date) – The daily time index for your sprint or flow-based period.
  • Workflow columns – State counts for each day, typically:
    • Backlog (not yet committed)
    • To Do (committed, not started)
    • In Progress
    • Review / Test (optional, if you use it)
    • Done (completed)

Important: Each workflow state should be a count of items at the end of that day. The chart will stack these counts to show cumulative totals.

Before You Start

  • Define your workflow states (columns) in the exact order work flows from left to right.
  • Decide the tracking period (e.g., 10–20 working days for a sprint, or a continuous monthly window for Kanban).
  • Agree on a daily cutoff time (e.g., 5:00pm). You’ll record state counts as of that time each day.

Step 1 — Set the Timeline

  1. In the Day/Date column, list each day you’ll track.
  2. If you do not work weekends, either omit them or include them with repeated counts from the previous working day (so the chart stays continuous).

Step 2 — Record Daily State Counts

  1. At your cutoff time each day, count the number of items in each state:
    • How many are in Backlog?
    • How many are in To Do?
    • How many are In Progress?
    • How many are in Review/Test (if used)?
    • How many are Done?
  2. Enter those counts into the row for that day. Do not enter daily deltas; enter the current counts per state.

Step 3 — Validate the Totals

Optionally, add a check column to ensure the sum of all states equals the current total scope for that day:

  • If your state columns are in B:E (Backlog, To Do, In Progress, Done), use a check like =SUM(B2:E2) for each row.
  • If scope grows or shrinks, the total will change. That’s okay—CFDs show this clearly.

Step 4 — Create the Cumulative Flow Chart (Stacked Area)

  1. Select the full table (Day/Date plus all state columns for all days).
  2. Insert a Stacked Area chart:
    • X-axis: Day/Date
    • Series: Each workflow state (Backlog, To Do, In Progress, Review/Test, Done)
  3. Order the series in the same left-to-right flow as your process. Typically, Backlog at the bottom and Done at the top (or vice versa) as long as you remain consistent.
  4. Name the chart (e.g., “Sprint 14 Cumulative Flow Diagram”).

How to Read the CFD

  • Band thickness = WIP in that state. A thicker band means more items are sitting in that column.
  • Overall height = total scope. If the top of the chart rises, scope is increasing; if it falls, scope is decreasing.
  • Done band slope = throughput. The steeper the top edge of the Done band, the faster you finish items per day.
  • Horizontal distance of a band ≈ lead time in that state. If items spend many days in a column, that band stretches horizontally.

Daily Workflow and Updates

  1. At the end of each day, update the counts for each state.
  2. Refresh the chart (it will update automatically if it references the table range).
  3. Call out any sudden band changes (scope added/removed, blockage resolved, policy changed, etc.).

Common Real-World Situations

  • Scope changes: If new items are added to Backlog or To Do, the total height increases. If items are removed, it decreases. This is normal and visible in the CFD.
  • Blocked items: If In Progress (or Review/Test) band thickens over several days, you likely have a bottleneck. Investigate causes and reduce WIP.
  • WIP limits: If you enforce limits per column, large band growth signals the limit was exceeded or items are not flowing smoothly.
  • Partial days: If you miss a day, duplicate the last known counts to keep the chart continuous (note it in your log).

Optional Calculations (Helpful Metrics)

  • Daily Throughput: Approximate as the daily increase in Done (e.g., Done_today - Done_yesterday).
  • Average WIP: Average of daily counts in In Progress (or sum across active states) over your period.
  • Little’s Law (rough check): Average Lead Time ≈ Average WIP ÷ Average Throughput. Use as a trend indicator, not an absolute.

Quality Checks

  • Monotonic Done: The Done count should never decrease over time.
  • No negative counts: All state counts must be zero or positive integers.
  • Consistent totals: The sum of all states each day should match your real total for that day.
  • Correct series order: Ensure states are stacked in process order; it makes the CFD easier to interpret.

Interpretation Tips

  • If In Progress grows while Done stays flat, items are starting but not finishing—reduce WIP, swarm, or remove blockers.
  • If Review/Test balloons, you may have a testing or QA bottleneck—rebalance skills or adjust policies.
  • If the top line rises rapidly, scope is expanding—reassess goals and capacity or renegotiate scope.
  • A steady climb in Done with stable WIP bands usually indicates a healthy, predictable flow.

Keeping the CFD Useful

  1. Update it daily at the same time.
  2. Discuss it in standups or reviews to make flow issues visible early.
  3. Pair it with explicit WIP limits and clear “Definition of Done” to maintain quality and predictability.

Summary

Record daily counts per workflow state, insert a Stacked Area chart, and keep the series ordered by your process flow. Read band thickness for WIP, top-line height for scope, and the Done slope for throughput. Use what you see to manage bottlenecks, control WIP, and improve predictability.

Date To Do In Progress Done
2025-09-015050
2025-09-025082
2025-09-0352105
2025-09-0452128
2025-09-05521413
2025-09-06601518
2025-09-07601624
2025-09-08641430
2025-09-09641238
2025-09-10641045

Project Management Bootcamp

Embark on a transformative journey with our Project Management Bootcamp at HK School of Management. Elevate from beginner to pro using the latest PMBOK and Process Groups Practice Guide. Our unique, engaging approach makes learning interactive and fun, replacing dull slides with dynamic doodles and real-life scenarios.

This hands-on program includes working on two full project plans. The first evolves as you learn, while the second culminates in a comprehensive plan, solidifying your expertise. You'll navigate real-world challenges, backed by quizzes and in-depth analysis, avoiding common pitfalls and setting you on a path to success.

Enhance your learning with downloadable materials and templates, invaluable for your future projects. The course covers essential topics like PMI, PMO, PMBOK, and project management ethics, delving into critical process groups and key areas such as scope, schedule, cost, and stakeholder management.

Learn from seasoned professionals and join a community of enthusiastic lifelong learners. Ready to master project management and lead with confidence? Enroll now and start your transformation!



Stop Managing Admin. Start Leading the Future!

HK School of Management helps you master AI-Prompt Engineering to automate chaos and drive strategic value. Move beyond status reports and risk logs by turning AI into your most capable assistant. Learn the core elements of prompt engineering to save hours every week and focus on high-value leadership. For the price of lunch, you get practical frameworks to future-proof your career and solve the blank page problem immediately. Backed by a 30-day money-back guarantee-zero risk, real impact.

Enroll Now
``` ### Marketing Notes for this Revision: * **The Hook:** I used the "Stop/Start" phrasing from your landing page description because it creates a clear transformation for the user. * **The Value:** It highlights the specific pain point mentioned in your text (drowning in administrative work) and offers the "AI Assistant" model as the solution. * **The Pricing/Risk:** I kept the "price of lunch" and "guarantee" messaging as it is a powerful way to reduce friction for a Udemy course. Would you like me to create a second version that focuses more specifically on the "fear of obsolescence" mentioned in your landing page info?